Skip to main content

‘Clean India’ mission not ending manual scavenging, activists say

MUMBAI: A flagship government program to modernise India’s sanitation has failed to tackle the practice of low caste women clearing faeces by hand, and has even exacerbated the problem by building toilets not connected to water supplies, campaigners say.
Prime Minister Narendra Modi launched the Swachh Bharat Abhiyan, or Clean India Mission, with much fanfare after he took office in 2014, sweeping a Delhi street with a broom. Since then, thousands of toilets have been built across the country.But Dalit communities, especially women, are still forced to be manual scavengers, a euphemism for clearing faeces from dry toilets and open drains by hand, despite laws to end the practice. The workers have it harder now, activists said.
“Swachh Bharat has diverted attention from ending manual scavenging, and makes it seem like the whole country is cleaning. But if that’s the case, then why are people still dying in septic tanks,” said activist Bezwada Wilson.
“There is also no discussion of caste, when nearly all sanitation workers are Dalits, and no recognition of the abuse they suffer,” said Wilson, who won a Ramon Magsaysay Award last year for his efforts to end manual scavenging.
Manual scavenging has long been an occupation thrust upon the Dalit community, the lowest ranked in India’s caste system.
At least 90 percent of the estimated one million manual scavengers are women, who have to clean public and private dry latrines with barely any safety equipment.
India, which banned caste-based discrimination in 1955, has passed several laws to end the practice, yet Dalit communities continue to face threats of violence if they try to give it up for other jobs.
More than 4 million individual toilets and about 223,000 community toilets have been built since the launch of Clean India mission to make the country open-defecation free.
Many toilets lack water connections or a continuous supply of water, and are not linked to the sewage network, said Wilson, whose own family members were manual scavengers for generations.
Rights groups will make a representation to the United Nations’ special rapporteur on the right to water and sanitation, who is visiting India from October 27, said Ramesh Nathan, general secretary of the National Campaign on Dalit Human Rights.
With pressure from the Clean India Mission, safety norms are flouted, and dozens of workers have died in septic tanks from toxic fumes, said Nathan.
Most deaths are unreported or claimed as accidental, so the employer is not liable to pay the compensation of 1 million rupees ($15,000), he told the Thomson Reuters Foundation.
A senior government official acknowledges manual scavenging is prevalent, but said Clean India ensures workers’ safety.
“We have already asked all states to convert dry toilets, and we recommend mechanical equipment for cleaning of toilets,” said J. B. Ravinder, a joint adviser for Swachh Bharat Urban.
“If manual cleaning is to be done, it has to be done with proper supervision and with the necessary safety equipment.”

Comments

Popular posts from this blog

US drone strike kills leader of Pakistan’s Jamaat-ul-Ahrar militants: spokesman

                                DERA ISMAIL KHAN:  The leader of Pakistani militant group Jamaat-ul-Ahrar, who planned some of the deadliest suicide bombings in Pakistan over the last year, died on Thursday of wounds sustained in a US drone strike in Afghanistan, a spokesman said. “Our leader, Omar Khalid Khorasani, was wounded in one of the recent drone strikes in Afghanistan. He was wounded badly, and today he was martyred,” Asad Mansoor, a Jamaat-ul-Ahrar spokesman, said by telephone.The killing comes ahead of American Secretary of State Rex Tillerson’s visit next week and is likely to further ease tensions between the often-wary allies, as Islamabad has been asking Washington for years to target militants who attack inside Pakistan and then hide over the border in Afghanistan. A splinter group of the Pakistani Taliban, Jamaat-ul-Ahrar has in the past also backed Middle East-based Islamic State and has increasingly targeted religious minorities in Pakistan. The group clai

PM commits all kinds of support for upcoming elections

KATHMANDU:  Prime Minister Sher Bahadur Deuba has committed to hold the upcoming federal and provincial elections on stipulated time. He further said that government was committed to extend all kinds of essential support for the elections.  According to Election Commission’s spokesperson Nawaraj Dhakal, in a meeting with Election Commission’s office bearers at PM’s official residence, Baluwatar today, PM Deuba committed to reach all kinds of support for elections to the commission. PM Deuba expressed happiness on the preparations going on for the elections and directed the EC officials to work in full speed for remaining preparations as well.Chief election commissioner Dr Ayodhee Prasad Yadav briefed PM Deuba about their preparations for elections. He informed PM Deuba that the political parties submitted their closed lists of candidates for the proportional system under the federal and provincial elections in the stipulated time with enthusiasm. On the occasion, PM and

‘Contractor’s negligence responsible for collapse of Jabdighat Bridge’

The government’s study panel has found that Pappu Construction — the contractor that built the Jabdighat Bridge over the Babai River in Bardiya — deviated from the design approved by the government during the construction process of the bridge, which resulted in its collapse during heavy floods on Babai River on August 21. The probe panel formed by the Department of Roads (DoR) has concluded that the contractor had not followed through on the design approved by the government during construction of the 425-metre-long bridge. According to Ayodhya Prasad Shrestha, coordinator of the probe panel and chief of Mid-western Regional Road Directorate Surkhet, the contractor’s negligence is one of the major reasons for collapse of the bridge even before it had been handed over to the government authority. “In our preliminary study, we found that the distance between the pillars of the bridge is inconsistent to the approved design. The gap between the pillars should have been 25 metres, b