Skip to main content

Cabinet expansion violates poll code, but can’t do anything: CEC YadaV

Chief Election Commissioner Ayodhee Prasad Yadav has said Monday’s Cabinet expansion is in violation of the election code of conduct but there is no way the Election Commission can initiate action against the prime minister.

Prime Minister Sher Bahadur Deuba on Monday inducted three ministers and one state minister from the Rastriya Prajatantra Party (Prajatantrik), making his Council of Ministers the largest ever in the country’s history with 54 members.
Speaking at a programme in the Capital on Wednesday, CEC Yadav said the Cabinet expansion “is in violation of poll code of conduct.” “But the EC can’t take action against the PM.  I can just say the EC’s attention has been drawn to the recent Cabinet expansion,” said CEC Yadav.  
The poll code for the provincial and federal polls has been in place since August 30.
Former chief election commissioner Nil Kantha Upreti told the Post that the election code of conduct should be applicable to all, including the government and the prime minister.


Comments

Popular posts from this blog

US drone strike kills leader of Pakistan’s Jamaat-ul-Ahrar militants: spokesman

                                DERA ISMAIL KHAN:  The leader of Pakistani militant group Jamaat-ul-Ahrar, who planned some of the deadliest suicide bombings in Pakistan over the last year, died on Thursday of wounds sustained in a US drone strike in Afghanistan, a spokesman said. “Our leader, Omar Khalid Khorasani, was wounded in one of the recent drone strikes in Afghanistan. He was wounded badly, and today he was martyred,” Asad Mansoor, a Jamaat-ul-Ahrar spokesman, said by telephone.The killing comes ahead of American Secretary of State Rex Tillerson’s visit next week and is likely to further ease tensions between the often-wary allies, as Islamabad has been asking Washington for years to target militants who attack inside Pakistan and then hide over the border in Afghanistan. A splinter group of the Pakistani Taliban, Jamaat-ul-Ahrar has in the past also backed Middle East-based Islamic State and has increasingly targeted religious minorities in Pakistan. The group clai

PM commits all kinds of support for upcoming elections

KATHMANDU:  Prime Minister Sher Bahadur Deuba has committed to hold the upcoming federal and provincial elections on stipulated time. He further said that government was committed to extend all kinds of essential support for the elections.  According to Election Commission’s spokesperson Nawaraj Dhakal, in a meeting with Election Commission’s office bearers at PM’s official residence, Baluwatar today, PM Deuba committed to reach all kinds of support for elections to the commission. PM Deuba expressed happiness on the preparations going on for the elections and directed the EC officials to work in full speed for remaining preparations as well.Chief election commissioner Dr Ayodhee Prasad Yadav briefed PM Deuba about their preparations for elections. He informed PM Deuba that the political parties submitted their closed lists of candidates for the proportional system under the federal and provincial elections in the stipulated time with enthusiasm. On the occasion, PM and

‘Contractor’s negligence responsible for collapse of Jabdighat Bridge’

The government’s study panel has found that Pappu Construction — the contractor that built the Jabdighat Bridge over the Babai River in Bardiya — deviated from the design approved by the government during the construction process of the bridge, which resulted in its collapse during heavy floods on Babai River on August 21. The probe panel formed by the Department of Roads (DoR) has concluded that the contractor had not followed through on the design approved by the government during construction of the 425-metre-long bridge. According to Ayodhya Prasad Shrestha, coordinator of the probe panel and chief of Mid-western Regional Road Directorate Surkhet, the contractor’s negligence is one of the major reasons for collapse of the bridge even before it had been handed over to the government authority. “In our preliminary study, we found that the distance between the pillars of the bridge is inconsistent to the approved design. The gap between the pillars should have been 25 metres, b